Quotes
I don’t think we’re even going to be able to go back to the hotel because the traffic lights are out,
So far, the toughest thing has been not been able to shower after my match. There’s no running water so I just had to take baby wipes and wipe myself, spray some perfume and call it a day,
Gauff said an hour after her match I was in the gym and it’s super dark, everyone is using the phones with flashlights, but it’s also kind of fun because everyone is talking to each other and the atmosphere is a little more friendly,
At this point this is only a situation that you can just laugh at if I was on-court because it’s probably not going to happen ever again,
If you take my phone away, I’m completely fine spending time without it,
said Andreeva, who turns 18 on Tuesday Simple things like they couldn’t get rackets strung and there was no power in the showers. They couldn’t make their way out onto the practice courts and they were eating their food by candlelight.”
Traffic lights don’t work lol we got out the car after 1 hour and 45 mins slowly moving and just walked to the hotel.”
In the caption, Gauff added I spoke to a number of players. Players at the hotel were told not to come on site, players on site were told not to leave,
For reasons beyond the control of the organisation and in order to guarantee general safety, the nationwide power-cut experienced in Spain on Monday 28 April has forced the cancellation of both the day and night sessions at the Madrid Open,
the tournament announced on social media Good afternoon, Considering the context, we were forced by the authorities to declare today's session closed (matches will continue behind closed doors),
The cut is preventing the use of electronic line calling systems and also left a spider cam dangling over the court inside Manolo Santana Stadium,
No power where the showers are. So I’m about to take a shower and I’ll let you all know how it goes,
Two singles matches and one doubles match at the ATP Masters 1000 event were underway when power was lost at 12:34 p.m. local time,
the ATP said on its official website Plans to restore the electricity supply have been activated in collaboration with companies in the sector following the zero that occurred in the peninsular system
Spain's national grid said in a statement on X The causes are being analyzed and all resources are being dedicated to solving it,